Emergency Watershed Protection-Streambank Stabilization Projects RFP No. 5038-Round 2 DSR-489/269 Lake Rd. and DSR-494/Site 4-Holly Shelter Wildlife Depot

The Pender County Planning & Community Development Department seeks to establish a contract with an experienced contractor, or contractors, to provide Streambank Stabilization Services in two designated locations in Pender County. The general purpose of the proposed work is to repair heavily eroded streambank channel side slopes located on a private and public property caused by Hurricane Florence in September of 2018. The sites are located on Horse Branch Creek in Willard and the Northeast Cape Fear River in Rocky Point. A mandatory pre-proposal site walk will be held on Tuesday, March 22nd at 9:00am. Contractors will need to meet in the parking lot at 805 S. Walker Street, Burgaw, NC 28425 by 9:00am. County staff will lead a caravan to each site. The deadline to submit a proposal is Thursday, March 31, 2022, at 4pm. Proposals must be submitted via FedEx, UPS, or hand delivered to 805 S. Walker Street, Burgaw, NC 28425. If you have questions please contact Daniel Adams at 910.259.0231.  Pender County reserves the right to reject any/all proposals.

Click here to view RFP # 5038-Round 2 DSR-489/269 Lake Rd. and DSR-494/Site 4-Holly Shelter Wildlife Depot.

Required Project Plans and Specifications are provided here:

DSR 489 Engineering Plans 

DSR 494 Engineering Plans

EWP Construction Plans

**UPDATE**    PLEASE CLICK TO SEE ADDENDUM 1 HERE.